[email protected] View More +Cryogenic Storage Tank
Type: vertical, horizontal
Manufacture standard: GB, ASME, EN
Capacity: 1M3 - 200M3
Working pressure: 0.8MPa, 1.6MPa, 2.0MPa, 2.4MPa, etc
Medium: LOX, LIN, LAr, LCO2, LNG
Technical Specifications
Packaging & Shipping
Report & Certifications
FAQ
DESCRIPTION
SinoCleansky design and manufactures the vertical and horizontal Cryogenic Storage Tank from 3m3 to 200m3. The thermal-insulating modes are including perlite powder vacuum insulation and super vacuum mulit-layer insulation.
SinoCleansky Cryogenic Storage Tank can be widely used in gas, chemical, machinery, metallurgy, medical, nuclear power and other industries.
To provide high-performance equipment, Sinocleansky make a series of stringent tests, including automatic welding process, X-ray and ultrasonic tests, Vacuum production and testing, hydraulic tests, leak test for inner vessel, etc.
Technical Specifications
Cryogenic Storage Tank
Standard | Type | Medium |
GB/ASME/EN | 3M3-16BAR | LOX / LIN / LAr |
GB/ASME/EN | 5M3-16BAR | LOX / LIN / LAr |
GB/ASME/EN | 10M3-16BAR | LOX / LIN / LAr |
GB/ASME/EN | 20M3-11BAR | LOX / LIN / LAr |
GB/ASME/EN | 20M3-16BAR | LOX / LIN / LAr |
GB/ASME/EN | 20M3-8BAR | LOX / LIN / LAr |
GB/ASME/EN | 25M3-16BAR | LOX / LIN / LAr |
GB/ASME/EN | 50M3-16BAR | LOX / LIN / LAr |
GB/ASME/EN | 100M3-8BAR | LOX / LIN / LAr |
GB/ASME/EN | 2M3-22BAR | LCO2 |
GB/ASME/EN | 10M3-25BAR | LCO2 |
GB/ASME/EN | 30M3-22BAR | LCO2 |
GB/ASME/EN | 30M3-25BAR | LCO2 |
Packaging & Shipping
The tanks will be packed in container & fixed with ropes, or shipped in bulk directly.
Report & Certifications
The tanks are delivered with detailed factory test report and third-party test report, such as for ASME.
Factory test report includes such as:
Hydrostatic test
X-rays test to weld
Non-destructive test
Helium-Leakage Detection
Vacuum Test
Retest certificate of safety valve
Welding test plate bending property
Welding test plate mechanical property
Final closing report
etc.
E-mail [email protected] to get more detailed test report specimen.
FAQ
- 01
What about the delivery time of liquid gas storage tank?
It usually takes 2-4 months to finish the production, based on the raw material delivery time.
- 02
How about the manufacture standard available?
The manufacture standard including GB/ASME/EN.
- 03
What about the warranty terms?
This product and the parts according to the shipment date can enjoy of 12 months (vacuum problems 36 months) warranty service.