+ 86-10-64709959
EN

Pe wa lorun Awọn iroyin & Awọn iṣẹlẹ Ile-iṣẹ Nẹtiwọki dánmọrán Blog

gbogbo awọn Isori

Ohun ọgbin Mini LNG

O wa nibi : Ile>ohun elo>Ohun ọgbin Mini LNG

Pe wa

Beijing Sinocleansky Technologies Corp.

adirẹsi:

Wangjing SOHO, Agbegbe Chaoyang, Beijing, PR China. Koodu ifiweranṣẹ : 100102

Foonu:

+ 86-10-64709959

imeeli:

[Imeeli ni idaabobo] Wo Diẹ sii +

Ohun ọgbin Mini LNG

Skid-mounted.

Modular-designed.

Tailor-made.

Dynamically-tested.

  • Apejuwe

  • Apoti & Ako

  • lorun

Apejuwe

Gasooo, enjoys our own core technology and complete process package of MRC for Mini LNG;

Gasooo, has turned our solution into successful demo project, also the first and only test platform for Mini LNG;

Gasooo, stands for “gas opening, operation and opportunity”, a brand born for LNG, and caters for all your demands on Mini LNG;

All Process Unit

Serial No.

work art

awọn akiyesi

1

Raw material gas pretreatment unit


2

Raw material gas deacidification unit


3

Raw material gas dehydration mercury remove unit


4

Mix refrigerant compressing unit


5

liquification cold box unit


6

Gauges and PSA nitrogen generate unit

nitrogen supply unit

7

Refrigerant storage and proportioning unit


8

Thermal oil furnace unit


9

Instrument control unit


10

Power supply engineering / power generation unit


11

LNG storage and loading unit

Aṣayan

Ohun elo Field

Specs of Demo Plant

Daily capacity :50000Nm3/day

Raw material gas pressure regulate,metering:

design flow rate 2291.3Nm3/h Actual operation 2083Nm3/h

inlet pressure 0.4Mpa, outlet 4.1Mpa

Purification unit :

design flow rate 2083Nm3/h Actual operation 2046Nm3/h

inlet pressure 4.03Mpa, outlet 3.92Mpa

Cold box:

flow rate 2046Nm3/h Actual operation 2046Nm3/h

inlet pressure 3.89 Mpa, outlet 0.3Mpa

o wu : Standard LNG -157℃

Technology:MRC

More Introduction of MRC

The mixed refrigerant refrigeration cycle is a process in which a mixture of N2 and C1 to C5 hydrocarbons is used as a circulating refrigerant. The process is characterized by the use of a mixed refrigerant in the refrigeration cycle, requiring only one compressor, which simplifies the process and reduces the cost.


Apoti & Ako

Skid-mounted and Modular-designed MINI LNG plant can be delivered, installation, and maintenance easily.

Pe wa